Elevator Panel Alignment and COP Problem

cb8072_5a2368b523ff41eebee283290c178a9e~mv2 (1).jpg

West Metro Fire

Lakewood, CO

The amazing team at West Metro Fire reached out to Summit Cabs to help clean up a cab. The installation crew didn't meet the standard of Chief at the station, so we came in as we agreed, this elevator cab interior needed some work.

First order of business was the elevator panels on the side walls were delivered, by another manufacturer, 4' too long! So, the elevator modernization crew cut this cherry laminate and stainless-steel panels down on site with a circular saw, leaving the panels at inconsistent widths with bad edges.

cb8072_85db5b55b7524d309e885eff00875d66~mv2 (1).jpg
cb8072_a09a72ef46cf4e7ea6c82008617be46f~mv2 (1).jpg
cb8072_b56fd88ecddf41f3bc5135a8eaaf276b~mv2 (1).jpg
cb8072_80b4f75c211d45018842ca4d7bdf9a11~mv2 (1).jpg

Damaged Panels and COP Problem

There was an imperfection on one of the Cherry laminate panels that we were requested to fix. Our specialized install team is capable of handling these kinds of imperfection on laminate on site.

The panel edges and sizes required the Summit Cabs install team to remove the side wall panels to bring back to our manufacturing shop and clean up the edges on our sliding saw.

The COP was produced with a cut out along the corner of the elevator cab interior. This was not accepted by the building management, and we swiftly took measurements of the COP surround and replaced it within two days. One day to measure then one day to install.

cb8072_402374f357ca426995d2fc9bd7b16a29~mv2 (1).jpg
cb8072_634860333e6a480d999f058a2f5aa6bf~mv2 (1).jpg
cb8072_0c63f8e8874541e88b928dc855f16c29~mv2 (1).jpg